Blackoak Capital Project

The Blackoak Capital project involved the installation of three 7kW Schneider EV link chargers, integrated with the EcoStructure load management system and connected to the NMI metering for billing purposes.

Our Solution

The setup was designed to minimise switchboard load during peak demand periods while allowing full access during low-demand periods, with the flexibility to expand the system by adding more chargers. The customer was provided with a dashboard for convenient access and monitoring.

Table of Contents

Take Advantage of Charge Up Workplace Grants